Copper Canyon Fire and Medical Station
Camp Verde, AZ | FCI was the CM/GC for this 4-bay, pre-engineered metal building (PEMB) fire station of 9,500 SF with a 500 SF mezzanine. The facility accommodates 8 firefighters, as well as a [...]
Pinal County Attorney’s Office
Florence, AZ | FCI was the CM/GC for the construction of this new, 52,000 square-foot, 5-story steel structure with curtain walls on two sides and architectural metal panels and keyhole windows with vertical perforated [...]

Grand River Health Patient Wing Expansion
Rifle, CO | FCI was the CM/GC for the addition of a 102,000 SF acute care patient wing expansion to the Grand River Health Hospital. This $40.5 million addition included the relocation of the [...]
Queen Creek Fire Station No. 4
Queen Creek, AZ | This 13,222 square-foot fire station includes three main areas: the lobby, the living quarters, and the support side. The lobby consists of 1,700 SF of space for public safety officers/administration, restrooms, and [...]
Chinle High School Modernization
Chinle, AZ | Complete modernization of the approximately 130,000 square-foot high school that included the Library, 2 art studios, storage, and a library/media center, classrooms, computer labs, 5 computer classrooms, nurses wing, cafeteria (with [...]

Navajo Technical University – 20,000
Chinle, AZ | This new NTU Chinle Campus includes a 20,000 square-foot, two-story classroom building with seven classrooms, biology and chemistry labs with a lab prep area, computer lab, student den, library/media room, faculty breakroom, [...]
Vaisala North American HQ Expansion
Louisville, CO | FCI completed the new headquarters building for Vaisala, a Finnish company specializing in industrial measurement equipment. The new two-story office building features a sustainable design and is ready for net-zero functionality. The [...]
Timberline Bank & Residence
Aspen, CO | FCI was the CM/GC for the renovation of an existing residence to a bank located right in downtown Aspen, CO. The basement and first floor are Timberline Bank offices and the upper levels [...]

Mesa County Valley School District 51 New Orchard Mesa Middle School
Grand Junction, CO | FCI was the CM/GC for this new 99,734 SF, two-story replacement middle school. The new school features windows throughout with plenty of natural light, a large commons area, designed to [...]

Timberline Bank Headquarters
Grand Junction, CO | FCI was the CM/GC for this new 4 story, 40,000 SF bank headquarters for Timberline Bank. This modern building was designed to promote a workplace culture of collaboration. Within the [...]
Two10 at Eagle Ranch
Eagle, CO | FCI was the CM/GC for this new 23,362 SF affordable housing complex for Eagle County. The project consists of 22 units ranging from one to two bedrooms. [...]

Platte River Power Authority Office Campus
Fort Collins, CO | The Platte River Power Authority Office Campus encompassed 97,200 SF of new construction, including a 55,000 SF headquarters building that sits on a 17-acre lot. This Headquarters building consists of [...]
Cives Steel Fabrication Plant
El Mirage, AZ | FCI was the CM/GC for the development of the 25 acre site which included the construction of a 58,000 SF administration building, five outbuildings, internal bridge crane, blasting areas for [...]

Phoenix South Transit Facility Refurbishment
Phoenix, AZ | FCI was the CM/GC for the renovation of the existing 78,000 SF City of Phoenix Transit Facility located on 17 acres. The project consisted of the interior and exterior renovations to [...]
Chinle High School Modernization
Chinle, AZ | This six phase high school modernization included renovations to classrooms, science labs, lecture halls, offices and the kitchen and dining area. It also included a new community meeting area, the renovation [...]