Take a look at our upcoming projects to get information on bidding for sub contracting work.

Bid Date Bid Time Project Name Information Project Location Total Cost Architect Estimator Plans Available Addenda Issued

Grand Junction, CO

  • 03-31-2015 02:00 PM Western State Colorado University Ute Hall Bathroom Remodel DIV 2:  SELECT DEMOLITION(BUILDING INTERIOR), DIV 6:  SOLID SURFACE COUNTERTOPS/SHOWER NICHES/WINDOW SILLS, DIV 8: HOLLOW METAL FRAMES, SOLID-CORE WOOD DOORS AND ACCESS DOORS, DIV 9: STEEL STUDS/DRYWALL, CERAMIC TILE AND PAINTING, DIV 10: TOILET COMPARTMENTS AND TOILET/BATH ACCESSORIES, DIV 15: HVAC, DIV 15: PLUMBING, DIV 16: ELECTRICAL Gunnison, CO $500,000 Ben White Architecture, LLC Scott Lanham Link Yes
  • 04-08-2015 01:00 PM Ross Montessori Charter School

    This project consists of the construction of a new 20,000SF, two-story, wood framed, K-8 school.

    Notice to proceed is expected April 22, 2015 with substantial completion due no later than December 15, 2015.  Trades must follow the International Green Construction Code 2012, requirements per spec section 018113. 

    There are currently six alternatives, please refer to spec section 012300 for a description of these alternates.  No bid can be withdrawn/expire for a period of 60 days after the bid date.  All questions must be submitted by 4PM, April 1st in order to be answered.

    Carbondale, CO $4,500,000 Cunningham Group Architecture, Inc. Anthony Haverkamp Link

New Mexico

Phoenix, AZ

  • 02-10-2015 02:00 PM South Transit Refurbishment – Rebid This project consists of a 121,875 s.f. refurbishment to the existing bus transit center along with 17 acres of civil work.  All trades are encompassed.

    Phoenix, AZ RNL Architects Mark Borodkin Link
  • 03-17-2015 02:00 PM Cesar Chavez Park This project consists of the construction of new soccer fields; a dog park; related additional parking and shade structures and infrastructure.  Trades include but are not limited to earthwork, site utilities, landscaping, concrete, masonry, steel, landscaping, and site furnishings and electrical.

    This project has a 12% SBE goal.

    Phoenix, AZ $3,000,000 Gavan Barker Mark Borodkin Link
  • 03-18-2015 12:00 PM Tohono O'odham San Xavier Fire & Police Sub Station

    This Project is for the Construction of a New 14,868 sq ft Fire Station and Police Substation is located in the San Xavier District on the Tohono O’odham Nation. The project is located just south of Tucson, just off I19 and San Xavier Road, just east of the Mission. This project has the following scopes including but not limited to; Earthwork, Surveying, Paving, Site Utilities, Site Concrete, Fencing, Landscaping, Building Concrete, CMU, Structural Steel, Rough Carpentry, Millwork, Quartz Counters, Insulation, Metal Roofing, Doors & Hardware, OH Doors, Drywall, Interior & Exterior Finishes, Specialties Mechanical, Plumbing, Fire Protection, Emergency Generator and Electrical.

    The site is an undeveloped area and can be easily noticed from the adjacent I19, located about 1/4 mile from the San Xavier Exit.

    Tohono O'odham $3,000,000 LEA Architects, LLC Keith Sabia Link Yes
  • 03-19-2015 01:00 PM Karigan Estates This project consists of all related trades for the vertical construction of track style residential homes in Window Rock, AZ.  Trades include but are not limited to post tension concrete, masonry, stone, stucco, metal roofing, insulation, flooring, millwork, rough carpentry, drywall, painting, appliances, doors, windows, HVAC, plumbing and electrical.  Please price each model – Ramah,  Kayenta, Shiprock and Window Rock

    There is no Arizona sales tax on this. Price as though you are bidding multiple homes at one time. This project is negotiated with FCI Constructors.

    Window Rock, AZ Perlman Architects Mark Borodkin Link

Cheyenne, WY

Longmont, CO

  • 04-01-2015 03:00 PM Mount View Youth Service Center- Upgrade Electronic Security Systems Mount View Youth Service Center – Upgrade Electronic Security Systems: Select demo, and remodel of existing facility. Limited site work for new underground cabling to be installed by horizontal boring for new fiber optic cable. Removal of existing control room(s) millwork, flooring, and security wiring and devices to be replaced with new. Bathroom demo and remodel in dorm pods, demo and replacement of doorways in buildings 55 & 56.

    Please see ‘Bid Alternates Form’ in the specifications for brief description of six (6) Add Alternates.
    Lakewood, CO $2,000,000 Reilly Johnson Architecture Steve Rademacher Link

Durango, CO

  • 02-27-2015 04:00 PM First United Methodist Church Addition This project includes the construction of a new mezzanine, 16’ wide x 42’ long, located in the Fellowship Hall, with a wood stair down to the Fellowship Hall, a new 2nd floor addition, 20’ wide x 42’ long with exterior metal stairs down to finished grade. 

    Durango, CO Context Architecture Boden Abbott Link
  • 03-31-2015 02:00 PM FLC Theater Building Life Safety Improvements - Phase 2 The project consists of the Phase 2 Life Safety Improvements to the existing Theater Building located on the Fort Lewis College campus in Durango, Colorado. The project work consists of replacement of roofing and insulation system on the low slope roof areas of the building; miscellaneous interior remodeling and improvements; new mechanical ventilation system in the building; fire alarm system replacement, and electrical distribution system improvements. Durango, CO $480,000 RMBA Architects Boden Abbott Link

Williston, ND

No items found.