Take a look at our upcoming projects to get information on bidding for sub contracting work.

Bid Date Bid Time Project Name Information Project Location Total Cost Architect Estimator Plans Available Addenda Issued

Grand Junction, CO

  • 05-04-2017 12:00 PM Mind Springs Health West Springs Hospital

    FCI Constructors, Inc. is requesting bids from subcontractors & suppliers for the Mind Springs Health project at West Springs Hospital. The project is located in Grand Junction, CO. Please reference the online plan room for Instructions to Bidders and bidding documents.

    BID MEMO #2     **The time has changed for the non-mandatory pre-bid site walk. The new time is 8:30 AM MST on Thursday 04/13/17. Meet
    in front of Building E (previously Strothman Distillery on North
    Avenue) on the campus. Please disregard the previously set times for the site walk.**

    BID MEMO #1      **The date has changed for the non-mandatory pre-bid site walk. The new date is Thursday 04/13/17 at 10:00
    AM MST. Meet in front of Building E (previously Strothman Distillery on
    North Avenue) on the campus. Please disregard the previously set dates
    for the site walk.**  

    Grand Junction, CO $25,000,000 Davis Partnership Architects This email address is being protected from spambots. You need JavaScript enabled to view it. Link
  • 05-10-2017 01:00 PM Snowmass Fire Station 71 - Building Package

    FCI Constructors is requesting bids from subcontractors an vendors for Bid Package #2 scope of work for the constructiono of the new Fire Station 71. 

    The following trades have already been awarded: construction survey, building/structure demolition, , site clearing, site demolition, earthwork, site utilities, pavement base courses, and building excavation and backfill work.

    Snowmass Village, CO $12,900,000 Charles Cunniffe Architects This email address is being protected from spambots. You need JavaScript enabled to view it. Link Yes
  • 06-06-2017 12:00 PM Montrose Columbine Middle School Replacement Project Bid Package #2 FCI Constructors is currently accepting Bid Package No. 2 proposals for the Columbine Middle School Replacement, in Montrose, CO. for the Montrose County School District RE-1J This bid package consists of Demolition, Site Utilities, Site Grading, Site Concrete, Asphalt Pavements, Bituminous Dampproofing & Foundation Insulation, Steel Package, Fire Sprinkler Package and MEP Package for a 75,000 SF addition and a 10,000 SF Renovation to an existing classroom wing. Montrose, CO $24,000,000 The Blythe Group + co This email address is being protected from spambots. You need JavaScript enabled to view it. Link

New Mexico

Phoenix, AZ

  • 05-15-2017 05:00 PM Scottsdale Fire Station #613 This project consists of a new LEED Certified fire station and associated site improvements, including road work for N. Hayden Rd. Scottsdale, AZ $4,300,000 Arrington Watkins Architects This email address is being protected from spambots. You need JavaScript enabled to view it. Link Yes

Cheyenne, WY

Frederick, CO

No items found.

Durango, CO

  • 05-18-2017 02:00 PM FLC 2017 Pedestrian Safety Improvements The project consists of the demolition and removal of approximately 3700 square yards of asphalt and concrete in the interior pedestrian area of the College campus; and the installation of approximately 1700 square yards of concrete sidewalk. The project will also include re-connecting the new sidewalk to existing asphalt paths with asphalt patching and establishment of landscaping in previously paved areas, and re-establishment of landscaping in disturbed areas. Durango, CO $450,000 Russell Engineering This email address is being protected from spambots. You need JavaScript enabled to view it. Link Yes
  • 05-25-2017 02:00 PM Gunnison Valley Health – Senior Care Center A new Senior Care Center 51,498 sqft is being built to replace the hospital’s existing nursing home.  The building is a one story structure predominately wood framed providing 48 private resident rooms (50 beds) subdivided into two sections.  Section 1 is 33,493 sqft consisting of wings A Skilled Nursing (17 private resident rooms), B Skilled Nursing (19 private resident rooms), main entry, lobby, common activity spaces, administrative & office areas.  Section 2 is 18,005 sqft consisting of wing C Memory Care(12 private resident rooms), main kitchen, central laundry, boiler room, electrical room, staff lounge, and therapy gym. The project includes the demolition of the 29,000 sqft nursing home and development of 8 acres of site infrastructure. Gunnison, CO $18,000,000 Davis Partnership This email address is being protected from spambots. You need JavaScript enabled to view it. Link Yes
  • 06-01-2017 02:00 PM Confluence II Apartments Work consists of three 3-story multifamily wood framed residential facilities, one street-level retail tenant space, and the associated site work for the project.

    PRE-BID MEETING:  Tuesday May 16th 10:00 am at the project site, 258 Pioneer Avenue, Durango, CO

    QUESTIONS DUE:  Questions deadline is Monday May 22 by 4:00 pm.
    Durango, CO $10,000,000 JNS This email address is being protected from spambots. You need JavaScript enabled to view it. Link

Williston, ND

No items found.