Office |
Project Name |
Information |
Project Location |
Total Cost |
Est. Completion |
Contract Type |
FCI Project Manager |
| Cheyenne | Baggs Elementary - LCSD #1 | New replacement school for LCSD#1 on site with an existing operational school. | Cheyenne, WY | $12,045,432 |
12/1/2008 |
CM/GC or CM at Risk | Choate,Ross |
| Cheyenne | Burns Elementary School - LCSD#2 | New Elementary School. | Burns, WY | $13,232,935 |
7/31/2009 |
CM/GC or CM at Risk | Choate,Ross |
| Cheyenne | Frontier Refining Office Bldg | New office building. | Cheyenne, WY | $4,687,733 |
3/1/2009 |
CM/GC or CM at Risk | Choate,Ross |
| Cheyenne | Carpenter Elementary Addition | Addition to existing Elem School in Carpenter. | Carpenter, WY | $969,208 |
CM/GC or CM at Risk | Choate, Ross | |
| Cheyenne | Information Library & Learning Center | A new 92,765-square-feet addition to the east of the current building, and a 188,656 SF renovation of existing space. The facility will contain offices and support space for Coe Library administration, collection, and technical services, and the Hebard Collection. In addition, the facility will house the Ellbogen Center for Teaching and Learning, the Writing Lab, Learning Commons (consultation rooms, group study rooms, and classrooms), Student Computer Commons (24-hour operation), a cafe, and Disability Support Services. | Laramie, WY | $39,417,817 |
8/1/2009 |
CM/GC or CM at Risk | Hinson,B |
| Cheyenne | Joint Forces Readiness Center Complex | 140,000 SF new administrative building, approx. 20,000 SF new vehicle maintenance building, and approx. Includes but is not limited to: utilities, water, sewer, electrical, telecom, network, and natural gas/propane. Work to be preformed at Warren Air Force Base. | Cheyenne, WY | $37,121,500 |
5/15/2010 |
Hard Bid - Open | Price,R |
| Cheyenne | Rossman Elementary School | New replacement elementary school. | Cheyenne, WY | $11,608,126 |
7/31/2009 |
CM/GC or CM at Risk | Choate,Ross |
| Cheyenne | Saddle Ridge Elementary | New elementary school | Cheyenne, WY | $11,162,127 |
7/31/2009 |
CM/GC or CM at Risk | Munz,B |
| Cheyenne | LCCC - Health Science & Central Plant | New Health Science Facility, New North Central Plant Facility, New Utility Tunnel connecting north Central Plant to Health Sciences. | Cheyenne, WY | $11,574,846 |
10/1/2008 |
CM/GC or CM at Risk | Lawrence,R |
Office |
Project Name |
Information |
Project Location |
Total Cost |
Est. Completion |
Contract Type |
FCI Project Manager |
| Denver | Mead High School | Located on 64 acres in Mead. Auditorium, two gymnasiums, cafeteria, administrative areas, library and two classroom wings constructed of steel frame, bar joists, load bearing CMU. Site work includes athletic fields, running track. | Mead, CO | $29,989,354 |
2/27/2009 | Hard Bid - Select | Price,R |
| Denver | UCD Bldg 500 Replace Water Piping | Domestic water line repairs to existing "un-remodeled" areas. | Aurora, CO | $1,000,000 |
CM/GC or CM at Risk | Carpenter,B | |
| Denver | Renaissance at Riverfront Lofts | Single building with U/G parking (or tuck under) w/ 4-story wood framing above. 101 units. | Denver, CO | $12,272,137 |
1/2/2009 | CM/GC or CM at Risk | Carpenter,B |
| Denver | CSU Pueblo Student Housing Facility P1 | New 250 bed residence hall. Part of a 750-bed master plan. | Pueblo, CO | $11,843,862 |
7/15/2009 | Design Build | Carpenter,B |
| Denver | Milliken Police & Court Building | New police station located 1 block east of Town Hall. Budget range from 1.7M - 2.0M | Milliken, CO | $2,350,000 |
4/1/2009 | CM/GC or CM at Risk | Racine, C. |
| Denver | Denver County Jail Production Kitchen | New production kitchen for inmates at the Smith Road facility. | Denver, CO | $6,916,000 |
10/1/2008 | CM/GC or CM at Risk | Lawrence,R |
| Denver | Parker Police Station | New two-building police station. | Parker, CO | $16,500,000 |
2/25/2011 | CM/GC or CM at Risk | Lawrence,R |
| Denver | Northglenn Vitamin Cottage | New store at 115th and Washington | Northglenn, CO | $2,559,278 |
9/15/2008 | CM/GC or CM at Risk | Racine, C. |
| Denver | Wells Fargo Bank - Prairie Center | New Wells Fargo in Brighton. | Brighton, CO | $1,336,763 |
12/15/2008 | Hard Bid - Select | Price,R |
| Denver | Fitzsimons Bldg 500 Phase 3 Remodel | Interior demolition and remodel of 1920's hospital into office space. Entire sixth floor remodel and work on six additional floors. | Aurora, CO | $9,427,851 |
9/1/2008 | CM/GC or CM at Risk | Carpenter,B |
| Denver | Willis Case Golf Clubhouse | New clubhouse, wood frame. Demo existing after new constructed. | Denver, CO | $3,585,922 |
CM/GC or CM at Risk | Racine, C. | |
Office |
Project Name |
Information |
Project Location |
Total Cost |
Est. Completion |
Contract Type |
FCI Project Manager |
| Durango | Bayfield Senior Center | A new 5,000 SF, single story senior center consisting of: site improvements, asphalt paving, utilities, concrete foundations and slab on grade, wood framing, pre-engineered roof trusses, fiber cement siding, asphalt shingles, drywall & acoustical ceilings, coiling counter doors, tile carpet, VCT, food service equipment, HVAC, plumbing and electrical systems. | Bayfield, CO | $1,174,002 |
11/15/2008 | Hard Bid - Select | Aupperle,M |
| Durango | ASC - Plachy Hall Addition/Renovation | CM/GC for Plachy Hall renovation/addition project, Roof replacement, various buildings. Phase 1 of 3. Renovation of approx. 102,952 gsf of existing space and construction of approx 25,200 gsf of new addition. |
Alamosa, CO | $9,292,820 |
5/1/2009 | CM/GC or CM at Risk | Tonnessen, R. |
| Durango | Durango Intermodal Transit Center | A 7,640 square foot building. It is steel framed with the exterior skin comprising of cast stone, brick veneer, Arriscraft stone and aluminum curtain window wall. The project also includes a 220’x8’ steel framed pedestrian walkway canopy with and aluminum framed polycarbonate panel. | Durango, CO | $4,000,000 |
3/15/2009 | CM/GC or CM at Risk | Aupperle,M |
| Durango | La Plata County Detention Facility Expansion | Expansion - The new expansion of a housing pod consists of 84 single bunked cells, all for male inmates, a single exercise area, a new medical unit, booking area, central control room and a new public lobby. | Durango, CO | $12,847,545 |
12/31/2008 | CM/GC or CM at Risk | Foutz,M |
| Durango | Aztec Schools | Summer remodels of Rippey, McCoy and Koogler. | Aztec, NM | $3,146,417 |
12/4/2008 | Hard Bid - Select | Shultz,D |
| Durango | Bayfield Town Hall | New 12,400 SF Main Building and a 8,000 SF 2 Story Future Addition | Bayfield, CO | $2,891,374 |
7/25/2008 | CM/GC or CM at Risk | Aupperle,M |
| Durango | BP America Operations Building | New construction. | Durango, CO | $13,702,804 |
10/31/2008 | CM/GC or CM at Risk | Gadd,B |
| Durango | Pope John Paul II Catholic Church | New church | Pagosa Springs, CO | $2,275,000 |
1/9/2009 | Hard Bid - Open | Gadd,B |
Office |
Project Name |
Information |
Project Location |
Total Cost |
Est. Completion |
Contract Type |
FCI Project Manager |
| Grand Junction | Educational Support Services Center | Education support services center | Parachute, CO | $1,626,937 |
9/4/2008 | CM/GC or CM at Risk | Coonts,B |
| Grand Junction | Halliburton GJ - Facility Site Improvements | Remodel | Naples, UT | $992,418 |
9/12/2008 | Design Build | Ash,D |
| Grand Junction | Halliburton Meeker - White River City Ranch | Site Improvements | Meeker, CO | $6,887,353 |
6/15/2009 | CM/GC or CM at Risk | Ash,D |
| Grand Junction | Riverview Technology Center DOE Improvements | Remodel | Grand Junction, CO | $712,327 |
9/12/2008 | CM/GC or CM at Risk | Ash,D |
| Grand Junction | Halliburton Naples - Field Camp Phase III | New 195,375 SF plant facility. | Naples, UT | $9,999,376 |
4/30/2009 | Design Build | Ash,D |
| Grand Junction | Center for Family Learning - Garfield Cty SD 16 | 29000 SF addition to existing facility | Parachute, CO | $11,530,751 |
11/14/2008 | CM/GC or CM at Risk | Coonts,B |
| Grand Junction | Battlement Mesa Middle School | New 81,747 SF Middle School | Battlement Mesa, CO | $19,331,751 |
7/13/2009 | CM/GC or CM at Risk | Coonts,B |
| Grand Junction | Halliburton Naples - Phase I 2000 S. St. Improveme | 2000 South Street Improvements | Vernal, UT | $1,500,000 |
9/30/2008 | Design Build | Ash,D |
| Grand Junction | Chipeta Elementary School | New 46,000 SF elementary school | Grand Junction, CO | $9,607,857 |
8/31/2008 | CM/GC or CM at Risk | Litzen,M |
| Grand Junction | Eagle County School District Office Renovation | Remodel | Eagle, CO | $741,866 |
9/24/2008 | CM/GC or CM at Risk | McAllister,T |
| Grand Junction | Family Health West Replacement Hospital | New Hospital | Fruita, CO | $13,750,000 |
5/8/2009 | CM/GC or CM at Risk | Keller,B |
| Grand Junction | Coal Ridge High School | remodel high school | New Castle, CO | $2,247,483 |
8/15/2008 | CM/GC or CM at Risk | Lloyd,K |
| Grand Junction | Grand Junction - Fleet Addition | Addition to the existing Fleet Maintenance Building | Grand Junction, CO | $1,079,519 |
10/17/2008 | Hard Bid - Open | Litzen,M |
| Grand Junction | CMC Summit Campus | New 40,000 SF, 2-story academic center with classrooms and auditorium. | Breckenridge, CO | $11,037,680 |
4/1/2009 | CM/GC or CM at Risk | Litzen,M |
| Grand Junction | Halliburton GJ - Bldgs B, C, D | Remodel | Grand Junction | $4,825,000 |
10/31/2008 | CM/GC or CM at Risk | Ash,D |
| Grand Junction | Rangely Recreation Center | Major renovation of Rangely Rec Center | Rangely, CO | $4,500,000 |
CM/GC or CM at Risk | Keller,B | |
| Grand Junction | Eagle Valley High School Addition & Renovation | Renovation and addition to existing Eagle Valley High School | Gypsum, CO | $19,250,000 |
9/30/2009 | CM/GC or CM at Risk | McAllister,T |
| Grand Junction | Bacon Community Building | 10,800 SF community center. | Grand Junction, CO | $5,079,914 |
9/1/2008 | CM/GC or CM at Risk | Keller,B |
| Grand Junction | St. Mary's Century Project | New Hospital Complex - Preconstruction Phase including CI 1, 2, 3A & 3B | Grand Junction, CO | $1,806,255 |
1/1/2009 | CM/GC or CM at Risk | Kiser,S |
| Grand Junction | Grand River Medical Center - 2007 Addition | Grand River Medical Center - Phase I of Master Plan | Rifle, CO | $22,833,454 |
3/13/2009 | CM/GC or CM at Risk | Lloyd,K |
| Grand Junction | Big O Tires - Rifle | New Store | Rifle, CO | $1,000,000 |
CM/GC or CM at Risk | Litzen,M | |
| Grand Junction | Eagle County Justice Center | Justice Center Expansion. 30ksf Courts addition; 5ksf sheriffs renovation to work release; gut of mechanical system in (E) bldg. | Eagle, CO | $20,000,000 |
11/1/2009 | CM/GC or CM at Risk | Keller,B |
Office |
Project Name |
Information |
Project Location |
Total Cost |
Est. Completion |
Contract Type |
FCI Project Manager |
| Phoenix | Resurrection Catholic Church Renovations | Remodel | Tempe, AZ | $2,078,900 | 12/15/2008 | CM/GC or CM at Risk | VanEynde,M |
| Phoenix | Window Rock Elem School | New School | Fort Defiance, AZ | $5,291,000 | Hard Bid - Open | Hafstrom,C | |
| Phoenix | Pinon 2008 Capital Improvement Plan | Remodels | Pinon, AZ | $885,920 | 3/15/2009 | CM/GC or CM at Risk | Hafstrom,C |
| Phoenix | Chinle Jr. High School | Addition to an existing campus. | Chinle, AZ | $13,449,272 | 8/15/2008 | CM/GC or CM at Risk | Albritton,S |
| Phoenix | Phoenix Fire Training Academy | Construction of training facility | Phoenix, AZ | $4,990,580 | 9/1/2009 | CM/GC or CM at Risk | Sabia,K |
| Phoenix | Flagstaff Fire Station #2 Construction | New fire station. | Flagstaff, AZ | $2,000,000 | CM/GC or CM at Risk | Sabia,K | |
| Phoenix | Flagstaff Fire Station #3 Construction | New fire station. | Flagstaff, AZ | $3,192,304 | 4/1/2009 | CM/GC or CM at Risk | Sabia,K |
| Phoenix | Kayenta Community Boarding School | New School Campus including a K-8 School, Dormitory, Maintenance Facility, 200K Gallon Water Tank, and Athletic Fields with sitework. | Kayenta, AZ | $31,034,903 | 12/30/2008 | Hard Bid - Open | Albritton,S |
| Phoenix | Glendale Fire Station 151 Construction | New construction | Glendale, AZ | $4,690,200 | 4/1/2009 | CM/GC or CM at Risk | Evenhuis,W |
| Phoenix | ADOT Air Rescue & Fire Fighting Facility | This is a 2 Story, 8 Bay 20,000 SF Air Rescue and Fire Fighting Facility located at the Grand Canyon National Park Airport. | Grand Canyon, AZ | $6,739,000 | Hard Bid - Open | Hafstrom,C | |
| Phoenix | Pinon Facility Renovations & New Construction | New Auto Tech Building Addition, Culinary Arts Renovations and Re-painting of the teacher houses at the Existing High School Campus. | Pinon, Arizona | $3,000,000 | Hard Bid - Open | Hafstrom,C | |