Current Projects as of 08-20-08

 

Cheyenne
Denver
Durango
Grand Junction
Phoenix

Office
Project Name
Information
Project Location
Total Cost
Est. Completion
Contract Type
FCI Project Manager
Cheyenne Baggs Elementary - LCSD #1 New replacement school for LCSD#1 on site with an existing operational school. Cheyenne, WY
$12,045,432
12/1/2008
CM/GC or CM at Risk Choate,Ross
Cheyenne Burns Elementary School - LCSD#2 New Elementary School. Burns, WY
$13,232,935
7/31/2009
CM/GC or CM at Risk Choate,Ross
Cheyenne Frontier Refining Office Bldg New office building. Cheyenne, WY
$4,687,733
3/1/2009
CM/GC or CM at Risk Choate,Ross
Cheyenne Carpenter Elementary Addition Addition to existing Elem School in Carpenter. Carpenter, WY
$969,208
 
CM/GC or CM at Risk Choate, Ross
Cheyenne Information Library & Learning Center A new 92,765-square-feet addition to the east of the current building, and a 188,656 SF renovation of existing space. The facility will contain offices and support space for Coe Library administration, collection, and technical services, and the Hebard Collection. In addition, the facility will house the Ellbogen Center for Teaching and Learning, the Writing Lab, Learning Commons (consultation rooms, group study rooms, and classrooms), Student Computer Commons (24-hour operation), a cafe, and Disability Support Services. Laramie, WY
$39,417,817
8/1/2009
CM/GC or CM at Risk Hinson,B
Cheyenne Joint Forces Readiness Center Complex 140,000 SF new administrative building, approx. 20,000 SF new vehicle maintenance building, and approx. Includes but is not limited to: utilities, water, sewer, electrical, telecom, network, and natural gas/propane. Work to be preformed at Warren Air Force Base. Cheyenne, WY
$37,121,500
 
5/15/2010
Hard Bid - Open Price,R
Cheyenne Rossman Elementary School New replacement elementary school. Cheyenne, WY
$11,608,126
7/31/2009
CM/GC or CM at Risk Choate,Ross
Cheyenne Saddle Ridge Elementary New elementary school Cheyenne, WY
$11,162,127
7/31/2009
CM/GC or CM at Risk Munz,B
Cheyenne LCCC - Health Science & Central Plant New Health Science Facility, New North Central Plant Facility, New Utility Tunnel connecting north Central Plant to Health Sciences. Cheyenne, WY
$11,574,846
10/1/2008
CM/GC or CM at Risk Lawrence,R
back to top
Office
Project Name
Information
Project Location
Total Cost
Est. Completion
Contract Type
FCI Project Manager
Denver Mead High School Located  on 64 acres in Mead.  Auditorium, two gymnasiums, cafeteria, administrative areas, library and two classroom wings constructed of steel frame, bar joists, load bearing CMU.  Site work includes athletic fields, running track. Mead, CO
$29,989,354
2/27/2009 Hard Bid - Select Price,R
Denver UCD Bldg 500 Replace Water Piping Domestic water line repairs to existing "un-remodeled" areas. Aurora, CO
$1,000,000
  CM/GC or CM at Risk Carpenter,B
Denver Renaissance at Riverfront Lofts Single building with U/G parking (or tuck under) w/ 4-story wood framing above.  101 units. Denver, CO
$12,272,137
1/2/2009 CM/GC or CM at Risk Carpenter,B
Denver CSU Pueblo Student Housing Facility P1 New 250 bed residence hall.  Part of a 750-bed master plan. Pueblo, CO
$11,843,862
7/15/2009 Design Build Carpenter,B
Denver Milliken Police & Court Building New police station located 1 block east of Town Hall.  Budget range from 1.7M - 2.0M Milliken, CO
$2,350,000
4/1/2009 CM/GC or CM at Risk Racine, C.
Denver Denver County Jail Production Kitchen New production kitchen for inmates at the Smith Road facility. Denver, CO
$6,916,000
10/1/2008 CM/GC or CM at Risk Lawrence,R
Denver Parker Police Station New two-building police station. Parker, CO
$16,500,000
2/25/2011 CM/GC or CM at Risk Lawrence,R
Denver Northglenn Vitamin Cottage New store at 115th and Washington Northglenn, CO
$2,559,278
9/15/2008 CM/GC or CM at Risk Racine, C.
Denver Wells Fargo Bank -  Prairie Center New Wells Fargo in Brighton. Brighton, CO
$1,336,763
12/15/2008 Hard Bid - Select Price,R
Denver Fitzsimons Bldg 500 Phase 3 Remodel Interior demolition and remodel of 1920's hospital into office space.  Entire sixth floor remodel and work on six additional floors. Aurora, CO
$9,427,851
9/1/2008 CM/GC or CM at Risk Carpenter,B
Denver Willis Case Golf Clubhouse New clubhouse, wood frame.  Demo existing after new constructed. Denver, CO
$3,585,922
  CM/GC or CM at Risk Racine, C.
back to top
Office
Project Name
Information
Project Location
Total Cost
Est. Completion
Contract Type
FCI Project Manager
Durango Bayfield Senior Center A new 5,000 SF, single story senior center consisting of: site improvements, asphalt paving, utilities, concrete foundations and slab on grade, wood framing, pre-engineered roof trusses, fiber cement siding, asphalt shingles, drywall & acoustical ceilings, coiling counter doors, tile carpet, VCT, food service equipment, HVAC, plumbing and electrical systems. Bayfield, CO
$1,174,002
11/15/2008 Hard Bid - Select Aupperle,M
Durango ASC - Plachy Hall Addition/Renovation CM/GC for Plachy Hall renovation/addition project, Roof replacement, various buildings.  Phase 1 of 3.



Renovation of approx. 102,952 gsf of existing space and construction of approx 25,200 gsf of new addition.
Alamosa, CO
$9,292,820
5/1/2009 CM/GC or CM at Risk Tonnessen, R.
Durango Durango Intermodal Transit Center A 7,640 square foot building.  It is steel framed with the exterior skin comprising of cast stone, brick veneer, Arriscraft stone and aluminum curtain window wall.  The project also includes a 220’x8’ steel framed pedestrian walkway canopy with and aluminum framed polycarbonate panel. Durango, CO
$4,000,000
3/15/2009 CM/GC or CM at Risk Aupperle,M
Durango La Plata County Detention Facility Expansion Expansion - The new expansion of a housing pod consists of 84 single bunked cells, all for male inmates, a single exercise area, a new medical unit, booking area, central control room and a new public lobby. Durango, CO
$12,847,545
12/31/2008 CM/GC or CM at Risk Foutz,M
Durango Aztec Schools Summer remodels of Rippey, McCoy and Koogler. Aztec, NM
$3,146,417
12/4/2008 Hard Bid - Select Shultz,D
Durango Bayfield Town Hall New 12,400 SF Main Building and a 8,000 SF 2 Story Future Addition Bayfield, CO
$2,891,374
7/25/2008 CM/GC or CM at Risk Aupperle,M
Durango BP America Operations Building New construction. Durango, CO
$13,702,804
10/31/2008 CM/GC or CM at Risk Gadd,B
Durango Pope John Paul II Catholic Church New church Pagosa Springs, CO
$2,275,000
1/9/2009 Hard Bid - Open Gadd,B
back to top
Office
Project Name
Information
Project Location
Total Cost
Est. Completion
Contract Type
FCI Project Manager
Grand Junction Educational Support Services Center Education support services center Parachute, CO
$1,626,937
9/4/2008 CM/GC or CM at Risk Coonts,B
Grand Junction Halliburton GJ - Facility Site Improvements Remodel Naples, UT
$992,418
9/12/2008 Design Build Ash,D
Grand Junction Halliburton Meeker - White River City Ranch Site Improvements Meeker, CO
$6,887,353
6/15/2009 CM/GC or CM at Risk Ash,D
Grand Junction Riverview Technology Center DOE Improvements Remodel Grand Junction, CO
$712,327
9/12/2008 CM/GC or CM at Risk Ash,D
Grand Junction Halliburton Naples - Field Camp Phase III New 195,375 SF plant facility. Naples, UT
$9,999,376
4/30/2009 Design Build Ash,D
Grand Junction Center for Family Learning - Garfield Cty SD 16 29000 SF addition to existing facility Parachute, CO
$11,530,751
11/14/2008 CM/GC or CM at Risk Coonts,B
Grand Junction Battlement Mesa Middle School New 81,747 SF Middle School Battlement Mesa, CO
$19,331,751
7/13/2009 CM/GC or CM at Risk Coonts,B
Grand Junction Halliburton Naples - Phase I 2000 S. St. Improveme 2000 South Street Improvements Vernal, UT
$1,500,000
9/30/2008 Design Build Ash,D
Grand Junction Chipeta Elementary School New 46,000 SF elementary school Grand Junction, CO
$9,607,857
8/31/2008 CM/GC or CM at Risk Litzen,M
Grand Junction Eagle County School District Office Renovation Remodel Eagle, CO
$741,866
9/24/2008 CM/GC or CM at Risk McAllister,T
Grand Junction Family Health West Replacement Hospital New Hospital Fruita, CO
$13,750,000
5/8/2009 CM/GC or CM at Risk Keller,B
Grand Junction Coal Ridge High School remodel high school New Castle, CO
$2,247,483
8/15/2008 CM/GC or CM at Risk Lloyd,K
Grand Junction Grand Junction - Fleet Addition Addition to the existing Fleet Maintenance Building Grand Junction, CO
$1,079,519
10/17/2008 Hard Bid - Open Litzen,M
Grand Junction CMC Summit Campus New 40,000 SF, 2-story academic center with classrooms and auditorium. Breckenridge, CO
$11,037,680
4/1/2009 CM/GC or CM at Risk Litzen,M
Grand Junction Halliburton GJ - Bldgs B, C, D Remodel Grand Junction
$4,825,000
10/31/2008 CM/GC or CM at Risk Ash,D
Grand Junction Rangely Recreation Center Major renovation of Rangely Rec Center Rangely, CO
$4,500,000
  CM/GC or CM at Risk Keller,B
Grand Junction Eagle Valley High School Addition & Renovation Renovation and addition to existing Eagle Valley High School Gypsum, CO
$19,250,000
9/30/2009 CM/GC or CM at Risk McAllister,T
Grand Junction Bacon Community Building 10,800 SF community center. Grand Junction, CO
$5,079,914
9/1/2008 CM/GC or CM at Risk Keller,B
Grand Junction St. Mary's Century Project New Hospital Complex - Preconstruction Phase including CI 1, 2, 3A & 3B Grand Junction, CO
$1,806,255
1/1/2009 CM/GC or CM at Risk Kiser,S
Grand Junction Grand River Medical Center - 2007 Addition Grand River Medical Center - Phase I of Master Plan Rifle, CO
$22,833,454
3/13/2009 CM/GC or CM at Risk Lloyd,K
Grand Junction Big O Tires - Rifle New Store Rifle, CO
$1,000,000
  CM/GC or CM at Risk Litzen,M
Grand Junction Eagle County Justice Center Justice Center Expansion.  30ksf Courts addition; 5ksf sheriffs renovation to work release; gut of mechanical system in (E) bldg. Eagle, CO
$20,000,000
11/1/2009 CM/GC or CM at Risk Keller,B
back to top
Office
Project Name
Information
Project Location
Total Cost
Est. Completion
Contract Type
FCI Project Manager
Phoenix Resurrection Catholic Church Renovations Remodel Tempe, AZ $2,078,900 12/15/2008 CM/GC or CM at Risk VanEynde,M
Phoenix Window Rock Elem School New School Fort Defiance, AZ $5,291,000   Hard Bid - Open Hafstrom,C
Phoenix Pinon 2008 Capital Improvement Plan Remodels Pinon, AZ $885,920 3/15/2009 CM/GC or CM at Risk Hafstrom,C
Phoenix Chinle Jr. High School Addition to an existing campus. Chinle, AZ $13,449,272 8/15/2008 CM/GC or CM at Risk Albritton,S
Phoenix Phoenix Fire Training Academy Construction of training facility Phoenix, AZ $4,990,580 9/1/2009 CM/GC or CM at Risk Sabia,K
Phoenix Flagstaff Fire Station #2 Construction New fire station. Flagstaff, AZ $2,000,000   CM/GC or CM at Risk Sabia,K
Phoenix Flagstaff Fire Station #3 Construction New fire station. Flagstaff, AZ $3,192,304 4/1/2009 CM/GC or CM at Risk Sabia,K
Phoenix Kayenta Community Boarding School New School Campus including a K-8 School, Dormitory, Maintenance Facility, 200K Gallon Water Tank, and Athletic Fields with sitework. Kayenta, AZ $31,034,903 12/30/2008 Hard Bid - Open Albritton,S
Phoenix Glendale Fire Station 151 Construction New construction Glendale, AZ $4,690,200 4/1/2009 CM/GC or CM at Risk Evenhuis,W
Phoenix ADOT Air Rescue & Fire Fighting Facility This is a 2 Story, 8 Bay 20,000 SF Air Rescue and Fire Fighting Facility located at the Grand Canyon National Park Airport. Grand Canyon, AZ $6,739,000   Hard Bid - Open Hafstrom,C
Phoenix Pinon Facility Renovations & New Construction New Auto Tech Building Addition, Culinary Arts Renovations and Re-painting of the teacher houses at the Existing High School Campus. Pinon, Arizona $3,000,000   Hard Bid - Open Hafstrom,C
 
We take care of the details.