Please click on the appropriate link to download the documents. Be advised that these documents are provided for general review. As all printers are different, FCI is not responsible for the accuracy of the scale on any printed documents. You may need a program to unzip the files. If you do not already have one you can download one by clicking here. You may also need a viewer for *pdf files. Click here to download one. |
|||||
|
Instruction to Bidders |
Bid Form |
Specifications |
Plans |
Addenda |
Other |
|
| Cheyenne, WY | ||||||
Archer Complex Public Works Building
|
Specs Vol 1 Specs Vol 2 |
Architectural |
Addend 1 | |||
|
Project has been postponed |
||||||
Central Wyoming College Intertribal Education & Community Center (Current) |
Specs | Architectural Civil Electrical Landscape Mechanical Structural |
|
|||
Joint Forces Readiness Center at Warren AFB -Conformance Drawings (August 2008) (Current) |
||||||
LCCC Dining Hall Facility Addition/Renovation (Current) |
Specs | Architectural Electrical Fire Protection Food Service General Mechanical Site Structural |
||||
LCSD#1 Nutritional Services and Facilities Warehouse (Current)
|
Specs | Architectural Civil Electrical General Mechanical Structural |
||||
LCSD #2 Various Work Packages (Current) |
Specs | Plans | Add 1 Add 2 Add 3 Add 4 |
|||
|
(Current) |
Specs V1 Specs V2 |
Architectural | ||||
Instruction to Bidders |
Bid Form |
Specifications |
Plans |
Addenda |
Other |
|
| Denver, CO (Longmont) | ||||||
| American Airlines' Admirals Club 100% Construction Drawings 90% Demolition Drawings |
Instructions to Bidders | Specs | Construction Demolition |
|||
Aurora Public Schools' P-8 School (Current) |
Vol I Vol II Vol III |
Drawings |
|
Soils Report Report Add. 1 Report Add. 2 |
||
Boulder Mental Health Center - Summit Building Renovation
|
Specs | Arch - I Arch - II Civil Structural Landscape Mech/Plumb Electrical |
Addend 1 | |||
Cherry Creek High - Fire Protection Upgrades (Current) |
Specs | Plans | ||||
Clear Creek County Jail Renovation BIDS DUE: 7-29-10 @2 PM |
Specs | Plans | Asbuilts (125MB) | |||
Columbia Middle School (Current) |
Specs | Plans | Addend 1 | |||
| Denver Jail Reroof | Plans | |||||
|
(Current) |
Cover Vol I
Architectural Civil Structural Landscape Cover Vol II Electrical Mechanical Plumbing Fire Prot. Security Elec. |
|||||
| DIA K9 Explosives Detection Unit Kennel | Specs | Plans | ||||
|
(Current) |
Specs | |||||
Eisenhower Elementary School - Renov & Add (Current) |
Bidders Book | Specs | Architectural Electrical General Mechanical Site Structural |
Soils Report | ||
|
(Current) |
Architectural and Structural
|
Addend 1 | ||||
| Fox Rent A Car @ DIA | Plans Permit Reference |
|||||
Heatherwood Elementary School - Renov & Add (Current) |
Bidders Book | Specs | Architectural Electrical General Mechanical Site Structural |
|||
Hill Middle School (Denver Public Schools) (Current) |
Specs | Plans | ||||
Intervention Community Correction Services Center
|
Specs V1 Specs V2 |
Architectural Civil Electrical Food Services Landscape Mechanical Structural |
Addend 1 Addend 2 |
|||
|
(Current)
|
Specs | Architectural Civil Structural MEP |
||||
|
(Current) |
Specs V1 Specs V2 |
Architectural Civil Electrical Landscape Mechanical Structural |
Instructions to Bidders | |||
Parker Police Headquarters - CONFORMANCE SET, SEPT 2009 (Current) |
Specs Vol I Specs Vol II |
Drawing Index Civil Architectural Structural Landscape Mechanical Electrical Technology Elec-Tech Fire Prot. HD Storage |
||||
Southwest Airlines Ops Renovations - Task 5 (Current) |
Phase I - Demo Phase II - Renovations |
Phase I - Demo Phase II - Renovations |
|
|||
West Metro Fire Station # 2 & #5 Bid Together - DUE 8-4-10 @ 2 PM |
#5 #2 |
|||||
Instruction to Bidders |
Bid Form |
Specifications |
Plans |
Addenda |
Other |
|
| Durango, CO | ||||||
Adams State College - Auxiliary Housing Phase 2 Site Improvements
|
Specs | Plans | Soils Report | |||
|
BIDS DUE: 8-3-10 2 PM |
Specs 1 Specs 2 |
Architectural Civil Cover Sheets Electrical Landscape Mechanical Structural |
Addend 1 | Soils Report | ||
Brubaker Place (Current) |
Instructions to Bidders | Specs |
|
Question & Answer Bid Documents | ||
Mesa Verde Visitor & Research Center BIDS DUE: 8-6-10 at 2 PM |
Specs 1a Specs 1b Specs 1c Specs 1d Specs 2a Specs 2b |
Plans 1-19 Plans 20-38 Plans 39-52 Plans 53-76 Plans 77-101 Plans 102-121 Plans 122-136 Plans 137-152 Plans 153-170 Plans 171-186 Plans 187-209 Plans 210-229 Plans 230-258 |
||||
|
Pre-Construction Set |
Specs | Plans | ||||
SUIT HVAC Replacement at Natatorium (Current) |
Existing Natatorium As-Builts | |||||
| VOA Senior Housing (Current) |
Specs | Plans | Addend 1-3 | |||
Instruction to Bidders |
Bid Form |
Specifications |
Plans |
Addenda |
Other |
|
| Grand Junction, CO | ||||||
Mountain Family Health BIDS DUE: 8-6-10 at 2:30 PM |
|
|
||||
Lionshead Transit Center
|
REVISED 2 Bid Schedule | Specs | General Arch V1 Arch V2 Civil V1 Civil V2 CDOT V1 CDOT V2 Structural Landscape Fire Alarm Mechanical Electrical |
Safety Letter | ||
Grand Junction Readiness Center Bid BIDS DUE: 08-05-10 @ 2 PM THIS INVITATION TO BID IS “ONLY” FOR THOSE SCOPES OF WORK LISTED ON THE INVITATION. ALL OTHER SCOPES OF WORK REQUIRED AN AIA 305 PRE-QUALIFICATION FORM TO BID AND ONLY THOSE COMPANIES THAT PRE-QUALIFIED WILL BE ALLOWED TO BID. THEY WILL NOTIFIED BY A PERSONEL LETTER. |
Specs Vol1 Specs Vol2 |
Cover Arch V1 Arch V2 General Civil Structural Landscape Interiors Wayfinding Furniture Fire Mechanical Plumbing Electrical ESS |
||||
POST BID Summit School District Administration Building PLEASE NOTE THESE PLANS ARE ONLY FOR INVITED SUBCONTRACTORS WHO WERE IN THE COMPETITIVE RANGE DURING THE BIDDING PROCESS. NO ADDITIONAL BIDS WILL BE ACCEPTED
REVISED PRICING DUE NO LATER THAN THE END OF BUSINESS WEDNESDAY JULY 07, 2010
|
Bid Form | |||||
Rocky Mountain Health Plans - Office Remodel
|
|
|||||
MB Construction Service - Shop and Office Facility
|
|
|||||
Lakota Canyon Ranch Fire Station
|
|
Architectural |
|
|||
Fruita Recreation Center and Mesa County Library All references to addenda are to be deleted. All previous bid documents are to be exchanged for new plans, specs, instructions and bid forms. If you had a set shipped to you previously, please contact Heather Pool for direction. The Bid Documents are being reissued in their entirety and the bid is starting over again at ground zero. Future addendum, will start at number one.
|
Bid Form | Arch. Vol 1 |
|
|||
Gunnison Bus Garage and Maintenance Facility
|
Bid Form | |||||
Gunnison HS Bid Package 04 THIS PROJECT HAS BID OUT AND BEEN AWARDED.
|
|
|
Architectural Civil Landscape Structural Food Service Fire Protection Acoustical Mechanical Electrical |
|
||
Eagle County Justice Center Bid Package 02 Please Note: SITEWORK AND UTILITIES, SITE CONCRETE, BUILDING CONCRETE, MASONRY, STRUCTURAL STEEL PACKAGE, PLUMBING, HVAC AND ELECTRICAL HAVE BID AND BEEN AWARDED. |
|
Arch. Vol 1 |
||||
Instruction to Bidders |
Bid Form |
Specifications |
Plans |
Addenda |
Other |
|
| Aztec, NM | ||||||
FCI Constructors of New Mexico, LLC
|
|
|||||
Instruction to Bidders |
Bid Form |
Specifications |
Plans |
Addenda |
Other |
|
| Phoenix, AZ | ||||||
Bullhead Branch Library Addition and Renovations Bid Date & Time: 08/12/2010 @ 2:00pm |
Bid Form | Specs V1 Specs V2 Specs V3 |
Plans - PDF | Addend 1 | ||
Central Yavapai FD Central Services Campus
|
Bid Form | Specs | Plans1-PDF Plans2-PDF Plans1 - TIFF Plans2 - TIFF |
Soils Report | ||
Lordsburg Border Patrol Station Bid Date & Time: 8/16/10 @ 1:00pm |
Volume 1 Volume 2 |
|||||
Naco Border Patrol Station Bid Date & Time: 8/2/10 at 2:00 PM |
Specs V1 Specs V2 Specs V3 |
Architectural |
Bidder Inquiry | |||
We take care of the details. |