|
Bid Date |
Bid Time |
Project Name |
Information |
Project Location
|
Total Cost |
Architect |
Estimator |
Plans Available |
Cheyenne |
||||||||
| 4/5/2010 | 2:00 PM | LCSD #2 Various Work Packages | Various work packages for Laramie County School District #2. | Pine Bluffs, WY | $1,500,000 | Tobin & Associates | ||
| 4/22/2010 | 2:00 PM | Johnson County/City of Buffalo Justice Center | New 56 bed jail + Police Bldg + Sheriff department in a shared facility. | Buffalo, WY | $9,470,000 | GSG Architecture | 3-29-10 | |
Denver |
||||||||
| 3/12/2010 | 2:00 PM | Lyons Schools - BID PACKAGE A | Addition/Renovations to Lyons Elementary and Middle/Sr. High Schools. Bid Package A includes the following trades: Earthwork/Utilities, Concrete Foundations/ Flatwork, Steel Fabrication/Erection, Translucent Wall Assemblies, Casework, Doors/Frames/Hardware Supply, Roof Top Units, Bleachers | Lyons, CO | $2,400,000 total | Hutton Architecture Studio | Tucker Peddicord | Online Now! |
| 3/17/2010 | 2:00 PM | CU Basketball/ Volleyball Practice Facility | A 3-level, 36,000 SF practice facility with locker rooms, administrative areas, and storage areas. | Boulder, CO | $8,000,000 | Sink Combs Dethlefs | Tucker Peddicord | Online Now! |
| 3/25/2010 | 2:00 PM | Aurora HIlls Middle School | New 130,000 SF replacement middle school. LEED Certified. | Aurora, CO | $23,000,000 | RB+B/Slater Paull | ||
| 3/26/2010 | 2:00 PM | Lyons Schools - BID PACKAGE B | Addition/Renovations to Lyons Elementary and Middle/Sr. High Schools. Bid Package B includes those trades not listed in Bid Package A above. | Lyons, CO | $2,400,000 total | Hutton Architecture Studio | Tucker Peddicord | Online Now! |
| 3/31/2010 | 2:00 PM | CU Willard Hall Renovation | Re-commissioning of Willard Hall back into original residence use from administrative use. | Boulder, CO | $4,500,000 | Architectural Workshop | ||
| 4/8/2010 | 2:00 PM | New Frederick High School (SVVSD HS#8) | New 188,000 SF high school to house 1,100 students including preparations for a future phase of 39,000 SF to house an additional 700 students. At CR 13 and CR 16 in Frederick. | Frederick, CO | $34,000,000 | klipp | Online Now! | |
| 4/16/2010 | Denver County Jail Housing Addition | New addition on South side of (E) Jail. | Denver, CO | $22,000,000 | Reilly Johnson Architecture | Bryan Hemeyer | ||
Durango |
||||||||
| 4/8/2010 | 2:00 PM | Alamosa City Hall/Library | Part 1 construction of new City Hall/Library, 1-story 25,295 sqft. Metal building, auger-cast piling w/CIP grade beams and slab on grade floor. Mechanical system to include ground-source heat pump. Part 2 remodel existing City Hall/Library/Fire Station. | Alamosa, CO | $7,000,000 | Reynolds + Associates Architecture & Engineering | Jim Burridge | Online Now! |
Grand Junction |
||||||||
| 3/9/2010 | 2:00 PM | Central High School - Kitchen Renovation | Kitchen Renovation. Plans will also be available from Plaza Reprographics. | Grand Junction, CO | $400,000 | Gregory S. Robson Architecture & Planning | Mike Davis | Online Now! |
| 4/1/2010 | 2:00 PM | Springhill Suites by Marriott | New 67,500 SF hotel in downtown Grand Junction. Bids are due to FCI Constructors, Inc. no later than 2:00 PM on April 1, 2010. Plans are also available from Plaza Reprographics for cost of printing. | Grand Junction, CO | $10,000,000 | GH2 Hospitality Architects | Mike Davis | Online Now! |
| 4/7/2010 | 2:00 PM | CMC - Spring Valley Campus Renovation | Remodel and upgrades to dormitory rooms. The bid process will ask qualified and interested contractors to bid a price per room. Mandatory pre-bid tour 03/15/10 @ 10:00 AM. Bids are due to FCI no later than 2:00 PM on April 7th. | Glenwood Springs, CO | Thira, Inc. | Jim Kearns | Online Now! | |
| 4/7/2010 | 2:00 PM | CMC - Alpine Campus Renovation | Remodel and upgrades to dormitory rooms. The bid process will ask qualified and interested contractors to bid a price per room. Mandatory pre-bid tour 03/17/10 @ 02:00 PM. Bids are due to FCI no later than 2:00 PM on April 7th. | Steamboat Springs, CO | Thira, Inc. | Jim Kearns | Online Now! | |
| 4/7/2010 | 2:00 PM | CMC - Timberline Campus Renovation | Remodel and upgrades to dormitory rooms.The bid process will ask qualified and interested contractors to bid a price per room. Mandatory pre-bid tour 03/18/10 @ 10:00 AM. Bids are due to FCI no later than 2:00 PM on April 7th. | Leadville, CO | Thira, Inc. | Jim Kearns | Online Now! | |
New Mexico |
||||||||
| 3/9/2010 | 2:00 PM | Vista Nueva HS & Park Ave. Elem | Vista Nueva: New kitchen addition, resurface play area, lighting & HVAC upgrades, improve interior & exterior child care walls. Park Ave Elem: renovation of existing bldgs, upgrade HVACm renovate playgrounds, provide site drainage. | Aztec, NM | $2,060,000 | Greer Stafford | Tim Smith | Online Now! |
| 3/23/2010 | 2:00 PM | County Public Health Office Addition | New 6,000 SF facility with admin/office areas including site amenities. | Portales, NM | $1,350,000 | NCA Architects, PC | Shayne Lovato | |
Phoenix |
||||||||
| 3/26/2010 | 10:30 AM | Gila County Public Works Admin & Sign Shop Bldg | Construction of (2) buildings, 1-story above grade for Pulic Works Administration and Sign Shop Building. Mandatory pre-bid conference on 2/25/10 at 10:00AM. | Globe, AZ | $3,000,000 | DLR Group | Brian Quintana | Online Now! |
| 4/1/2010 | 2:00 PM | NM Army Nat'l Guard Army Aviation Support Facility | New Construction of an Air Aviation Support Facility (AASF) and Aircraft Rescue and Firegihting Facility (ARFF). | Santa Fe, NM | $25,000,000 | US Army Corp of Engineers | Shayne Lovato | |
| 4/5/2010 | 2:00 PM | New Border Patrol Station - Ajo, Arizona | Multi-building border patrol station in Ajo, AZ. Primary building is the station structure, 2nd building is maintenance, and 3rd building is tire storage. Project includes canopies/shelters along with site improvements. Pre-bid meeting is on Mar. 16th. | Ajo, AZ | $32,000,000 | US Army Corp of Engineers | Brian Quintana | Online Now! |
We take care of the details. |